Friday, March 4, 2011

Chiller and Main Water Storage Installed

We installed the 1 1/2 HP chiller and 300 gallon main water storage tank today. All electrical connections are now finished. We have finished plumbing on the chiller, Main tank, and three ebb and flow tables.

We reduced the size of the tables from 3x6 ft to 2x4 ft, and decided to double stack the ebb and flow tables. We get more growing space in a smaller footprint. We have plenty of height to ensure ample sunlight to the grow tables and the plants are low height (strawberries). The 75 gallon water tank serving each 2 stack table will still be more than sufficient. A few "field engineering" changes to the tables which we had not built yet, and an order for a few more trays and fitting, and done.

We still have a punch list of items to complete:

1. Plumb 3 Monster Ebb n Gro systems into the system
2. Install greenhouse gutter system
3. Build Ebb and Flow Tables for growing trays
4. Program Rain Bird and grow system timers
5. System Test
6. Wash Hydroton
7. Plant !